Digitalcommand centerfor pipe fabrication.

Every joint, every spool and every sign-off on one live record.

Pipesurf · Project Progress
Pipesurf Project Progress Tracker: 36% complete, 1,999 inch-dia across 360 joints and 100 spools, with completion for every phase

You’re building spools. You’re also chasing them.

Every day, the same questions, from every yard.

  • ✕
    “Where are we, really?”Progress lives in a spreadsheet someone updates when they remember.
  • ✕
    “Why are we doing this joint again?”A rejection passed by phone lands on the wrong crew. You pay twice.
  • ✕
    “The client wants the dossier by Friday.”Heat numbers, welders and reports rebuilt from paper and memory.
  • ✕
    “Only one person knows.”The real status of the job sits in two or three people’s heads.
Yard group38 members47 unread
KA
Karim · Fit-up▣ IMG_2231.jpg

SW180 fit-up done ✅ pls check

PN
Priya · QC

SW180 rejected. Gap too wide

KA
Karim · Fit-up

which SW180?? SPL36 or SPL37

AN
Anil · Stores

anyone has heat no. for SPL37 side 2?

PM
Project Manager

Client wants the dossier by Friday 🙏

OM
Omar · NDT

resending RT report for SW139, check mail

Lost in the thread
Pipesurf
One recordevery joint, every sign-off
SW180Fit-up completeWaiting on the Production Engineer
✓
SW180 · SPL36Rejected by QC: gap too wideRouted back to the Fit-Up Foreman
✓
SPL37Heat numbers picked from the listB52871K · H45821A
✓
SW139RT report attachedNDT Pass 1 · on the joint
✓
HandoverRecords build as the work is doneHeat numbers, welders, tests, reports
✓

From the group chat to one record: every message becomes a signed, traceable step.

Pipesurf puts the whole yard on one record

What changes the week you go live.

Pipesurf · Project Progress
Pipesurf Project Progress Tracker: 36% complete, 1,999 inch-dia across 360 joints and 100 spools, with completion for every phase
Pipesurf · Joint Staging
Joint Staging: the Production Engineer selects four joints and moves them to fit-up
Pipesurf · Joint Details · SW139
Joint record: heat numbers on both sides at fit-up, then the WPS and the process and welder for every weld pass
Pipesurf · Revision Review
Revision summary: a joint deletion waiting for the Project Manager to approve or reject, with the affected joints listed
Pipesurf · Project Progress
Queue breakdown by phase: inch-dia waiting with the crew, the Production Engineer and QC

Pipesurf in action

From joint list to dispatch, role by role.

Prefer a live walkthrough? We’ll run it on a project like yours.

Pipesurf explainer: the digital command center for pipe fabrication
Pipesurf overview
1:06

One system for everyone who touches a spool

Office on the web; shop floor on the phone.

Management
I see the real state of every project without picking up the phone.
  • Live progress by joint, spool and inch-dia
  • The bottleneck in plain sight
  • A record your client can trust
Pipesurf for Management
Pipesurf · Project Manager Dashboard
Project Manager dashboard: 36% complete, 360 joints, 100 spools, spools dispatched and phase-wise progress in inch-dia
Production Engineers
I decide what the yard works on, from my desk or from the floor.
  • Release work to the yard in batches
  • Approvals and rejections counted on your phone
  • Route every rejection with a reason
Pipesurf for Production Engineers
Pipesurf · Joint Staging
Joint Staging: the Production Engineer selects four joints and moves them to fit-up
QC Inspectors
My decisions are on record, and my reports sit on the joint.
  • Verify from a queue
  • Skip a phase with your name on it
  • Attach reports in bulk, any time
Pipesurf for QC Inspectors
Pipesurf · NDT and Other Tests
QC verification queue for NDT and other tests, with passed and failed results waiting for review
Material Controllers
Heat numbers are under control, and dispatch paperwork lives with the spool.
  • One heat number list per project
  • Approve spools for dispatch
  • Delivery note and packing list on the spool
Pipesurf for Material Controllers
Pipesurf · Heat Numbers
Heat Numbers: the project's heat number list, each tied to a material grade
Foremen
My queue is on my phone, and I know why anything came back.
  • Work in the order your engineer set
  • Heat numbers on the joint, not on paper
  • Complete fit-up in one tap
Pipesurf for Foremen
Pipesurf mobile app: the fit-up queue with the joints released to the foreman
Pipesurf mobile app: joint details with heat numbers and the Complete Fit-up button
Pipesurf mobile app: the joint timeline showing who did what and when

See all roles

Live within hours

Start the day you sign. Your company data goes in within hours.

Today
Start

Sign up, and your company is set up on Pipesurf straight away.

Company ready ✓
Within hours
Your standards go in

We set up your welders, WPS documents, materials and users.

WeldersWPSMaterialsUsers
Next
First joint list

Upload the Excel. QC completes it and the Project Manager approves.

Xjoint_list.xlsx✓
From then on
The yard runs on it

Office on the web; shop floor on the phone.

OfficeShop floor

Every joint. Every spool. Under control.

See Pipesurf running on a project like yours. 30 minutes, on the roles you care about.

Chat on WhatsApp