Record the weld as you make it.

Assign the WPS, record the process and welder for every pass, and run heat treatment, from one queue on your phone.

JOINT SW353 · 3" SCH 80WPS-CS-002✓ COMPLETE · SENT TO QC
Cutaway of a pipe butt weld: the V-groove filling pass by pass, root, hot, fill and capRootSMAW · w2224HotSMAW · w2224FillGTAW · ad112CapGTAW · ad112SECTION A–A · 3" SCH 80 · V-GROOVE 60°
RootSMAWw2224✓ qualified
HotSMAWw2224✓ qualified
FillGTAWad112✓ qualified
CapGTAWad112✓ qualified
  1. 01
    Assign the WPSOne WPS for the batch. The welder list now follows it.
  2. 02
    Root passProcess and welder recorded.
  3. 03
    Hot passSame welder, same record.
  4. 04
    Fill passesA second welder, qualified for GTAW.
  5. 05
    Cap passRoot and cap in: the joint can be completed.
  6. 06
    CompleteThe record is ready before QC opens it.

Assign the WPS. One WPS for the batch. The welder list now follows it.

Root pass. Process and welder recorded.

Hot pass. Same welder, same record.

Fill passes. A second welder, qualified for GTAW.

Cap pass. Root and cap in: the joint can be completed.

Complete. The record is ready before QC opens it.

Sound familiar?

What the week looks like before Pipesurf.

ISSUE-01Weld records written at the end of the shift.

From memory, for dozens of joints.

ISSUE-02Is he qualified for this WPS?

It’s checked on paper, if at all.

ISSUE-03Which joints need PWHT?

It’s on a list somewhere. The wrong joint gets missed.

ISSUE-04QC sends it back for a missing detail.

Now you’re digging through notebooks.

What changes with Pipesurf

Four things that stop happening the week you go live.

Today
With Pipesurf
✕End-of-shift paperwork
✓WPS and welder recorded per pass, in a few taps
✕Qualification checked on paper
✓Only welders qualified for the process under that WPS can be picked
✕PWHT tracked on a separate list
✓Joints that need PWHT come to your PWHT queue automatically
✕Records rebuilt for QC
✓The record is already complete when QC opens it

What you get

Built around the work you actually do, not around a spreadsheet.

01

WPS in one step

Assign the WPS to a batch of joints at once.

02

Every pass on record

Root, hot, fill and cap, each with its process and welder, or all at once.

03

Qualified hands only

The welder list follows the WPS and process you choose.

04

PWHT included

Joints that need heat treatment come to you automatically.

Who you work with

Every hand-off in the job sits on one record: yours, the people you work with directly, and everyone else.

Every joint. Every spool. Under control.

See how Welding Foremen work in Pipesurf, on a project like yours. 30 minutes.

Chat on WhatsApp